Agenda Item Description
Authorize (1) a Local Project Advance Funding Agreement with the Texas Department of Transportation for a U.S. Department of Transportation - Federal Highway Administration 2015-2017 Highway Safety Improvement Program Grant (Agreement No. CSJ 0430-01-060, etc., CFDA No. 20.205) in the amount of $3,214,417.51 to design, upgrade, and construct nine traffic signals and associated on-system intersection improvements at: Scyene Road (SH 352) and Prairie Creek Road, Robert B. Cullum Boulevard (SH 352) and Fitzhugh Avenue, Scyene Road (SH 352) and St. Augustine Drive, Buckner Boulevard (Loop 12) and Samuell Boulevard, Buckner Boulevard (Loop 12) and Mercer Drive, Buckner Boulevard (Loop 12) and Lake Highlands Drive, Kiest Boulevard (Spur 303) and Duncanville Road, Lancaster Road (SH 342) and Camp Wisdom Road, and Harry Hines Boulevard (Loop 354) at Lombardy Lane; (2) a required local match in the amount of $42,397.50 to be issued as a warrant check for State construction costs and other State direct costs; and (3) an additional required local match identified for design of the traffic signals in the amount of $198,900.00, previously approved on June 14, 2017, by Resolution No. 17-0931 - Total not to exceed $3,214,417.51 - Financing: Texas Department of Transportation Grant Funds ($2,973,120.01) and General Fund ($42,397.50)