Projdesc
The Malcolm X Bridge is located over the DART Central Rail Operating Facility, Ferris Street, Oak Lane, and Cranfill Street in Dallas, Texas. The existing bridge is1,235 ft long and 52.7 ft wide. The bridge consists of 3 continuous and 22 simple span steel I-beam girders that are supported on open concrete piers and pier caps.The scope of service includes Removing the existing deck, railing, illumination and sidewalks, Replacing the deck with a composite deck, Strengthening and Repairs to various substructure elements, Alternatives for Traffic Control Plans (TCP), bid processing, construction services, etc. The Design services would be completed within one year (by March 27). However, the contract also includes construction services and will remain active until construction is completed.